RCC framed structure designed as per Seismic Zone II requirements
Super Structure : Framed structure Internal Walls : 100mm / 4” inch solid cement concrete / Porotherm blocks External Walls : 150mm / 6” inch Solid cement concrete / Porotherm blocks Roof slab : Reinforced cement concrete / waterproofing with CC screed Car parking : Covered Car parkingStaircase : SS hand rail
Balcony : SS railing with tough-end glass
All internal walls are smoothly plastered (or) Gypsum finishing
+ Interior walls with emulsion and wall care finishing
+ Vitrified tiles of well reputed brand for the living, dining, kitchen and bedrooms
+ Ceramic glazed tiles dado up to 7 feet
+ Granite Kitchen platform with stainless steel sink
+ 2 feet dado above granite kitchen platform area in ceramic glazed tiles + Provision for water purifier point in kitchen + Provision for washing machine in utility area + Provision for refrigerator, microwave/oven, mixi and modular chimney+ Total 6 No's - 8 passengers lift
+ 4 No's - service lift, Make: Johnson/KONE or equivalent.+ Engineered Hard wood door frame for main door with solid shutters
+ All bedroom doors with well-engineered hardwood frames and flush shutters enamel painted + French doors, windows with safety grill - UPVC with clear glass + Toilet and terrace doors will be door shutters with water resistant paint on the wet face.+ TV point in living room and master bedroom
+ Fire resistant electrical wires of Anchor / Roma or equivalent make + Elegant modular electrical switches of Anchor or equivalent make. For safety one Earth Leakage Circuit Breaker + One Miniature Circuit Breaker (MCB) based main distribution box for each flat + Telephone points in master bedroom and living room + A/C power point in master bedroom + Fire Safety precautions as per the FIRE norms+ 24/7 security with intercom facility
+ Biometric instruments+ Standby generator for lights in common areas, lifts and pumps
+ DG Back up for each apartment up to 1 KVA + Solar lighting system in open area+ BESCOM - Power
+ 24 Hours uninterrupted water supply with sufficient source of bore well and corporation (on availability) water supply system + Synchronized with standard automation system + Rain water harvesting system to recharge the water table + STP (Sewage Treatment Plant)